Our team has led architecture and migration planning for major data-centre moves while replacing end-of-life infrastructure, reducing geographic concentration risk, and strengthening recovery capability.
Project challenge
Move critical infrastructure to a new data-centre location while replacing aging platforms and avoiding a simple lift-and-shift of existing risk.
Delivery
- The team defined the target data-centre architecture, migration strategy, equipment requirements, dependencies, and implementation sequence.
- The team evaluated compute, storage, core networking, firewall, backup, and connectivity requirements with multiple technology vendors.
- The team designed dedicated backup, vault, and isolated recovery zones as part of the target state rather than as a later add-on.
- The team built migration and risk plans around lifecycle, geographic redundancy, recovery, change management, and business continuity.
Outcome
A modernization program that combined relocation, lifecycle renewal, geographic risk reduction, and cyber-recovery improvements in one target architecture.
Technology and methods
Client-confidential case study. Client-identifying information, addressing, credentials, security-sensitive configuration, and other protected details are intentionally omitted.